Home News

Erection of the use of scaffolding maintenance process

Good quality Steel Plank for sales
Good quality Steel Plank for sales
I'm Online Chat Now
Company News
Erection of the use of scaffolding maintenance process
Erection of the use of scaffolding maintenance process

1, erection of the completed scaffolding system, scaffolding rental should be set up to conduct a daily scaffolding structural inspection, check the pole, walkway board with or without sinking, loose, scaffolding all the fasteners with or without slip and loose phenomenon, the entire frame The body of each part of the components are complete and complete.

2, Drainage should be done scaffolding foundation, after each raining, the foundation of the scaffolding frame should be fully inspected to prevent sinking of scaffolding basal water.

3, the operating layer scaffolding construction load is prohibited more than 270 kg / square meter, shall not support the bar, rope and rope fixed on the scaffolding, suspended in the scaffold body hanging heavy objects.

4, erection of the completed scaffolding system, prohibiting any unauthorized removal of any parts on the scaffolding.

5, in the face of more than six gale, fog, heavy rain and heavy snow should immediately suspend the scaffolding operation, before returning to work must check has been erected scaffolding no problem to continue working

Pub Time : 2017-12-20 16:47:47 >> News list
Contact Details
Tianjin Shisheng Scaffolding & Formwork Group Co., Ltd.

Contact Person: Mr. Mike Ma

Tel: +86-22-83973806

Fax: +86-22-83973806

Send your inquiry directly to us (0 / 3000)